Report Fraud and Corruption

Addendum No. 2 – Pre-qualification – Design and Build of Utility Scale Battery Energy Storage Systems (BESS) and Transmission Connection Infrastructure

Procurement Documents
Driving Economic Growth for
Shared Prosperity
Contact